Operated by ONE BOM LIMITED (Hong Kong) · sourcing and inspection team in ShenzhenAllocation by confirmed order and payment priorityEvery lot inspected before shippingEscrow / PayPal / T/T / L/C

ChipRadar™

Which TI power parts got more expensive this week?

Week 35: 7 of 40 tracked TI power-management parts rose more than 10%; TPS54331DR +12.5%, lead time steady at 3 days.

MPN30dLead
TPS54331DR+12.5%3d
AD7606BSTZ+38%7d

Quality process, mapped to industry standards

  1. Source verification — supplier credentials, lot origin declaration, authorized-chain records (AS6081)
  2. Incoming visual inspection — markings, coplanarity, oxidation, refurbishment signs (IDEA-STD-1010-B)
  3. X-ray — die, bond wires and voids compared with a golden sample (AS6171/4)
  4. Decap / solvent test — sample decapsulation for die marking; acetone marking test (IDEA-STD-1010-B)
  5. Functional / electrical test — key parameters on bench or at a third-party lab (AS6171/6)
  6. Moisture & packaging — MSL level, vacuum bag, desiccant, humidity indicator (JEDEC J-STD-020 / J-STD-033)
  7. Shipment report — inspection photos and report number with every lot

What happens after you send an RFQ

  1. 1. We confirm your request and start the channel check
  2. 2. Quote with price, lead time, date code and Incoterm
  3. 3. Pay by T/T, PayPal, L/C or escrow
  4. 4. Inspection photos sent before shipping
  5. 5. 30-day quality guarantee and return policy

How to buy: payment terms, Incoterms and 30-day guarantee →