Operated by ONE BOM LIMITED (Hong Kong) · sourcing and inspection team in ShenzhenAllocation by confirmed order and payment priorityEvery lot inspected before shippingEscrow / PayPal / T/T / L/C

ChipRadar™

Market watch

Weekly shortage and price reports on TI, ADI and other hard-to-find parts, dated and sourced from TI-ADI transaction data; latest issue 2026-08-24.

Weekly reports

Category risk

TI power management

40 parts tracked, 7 rose >10%, lead time +0.5 d — 2026-08-24

ADI data converters

25 parts tracked, 9 rose >10%, lead time +4 d — 2026-08-24

Quality process, mapped to industry standards

  1. Source verification — supplier credentials, lot origin declaration, authorized-chain records (AS6081)
  2. Incoming visual inspection — markings, coplanarity, oxidation, refurbishment signs (IDEA-STD-1010-B)
  3. X-ray — die, bond wires and voids compared with a golden sample (AS6171/4)
  4. Decap / solvent test — sample decapsulation for die marking; acetone marking test (IDEA-STD-1010-B)
  5. Functional / electrical test — key parameters on bench or at a third-party lab (AS6171/6)
  6. Moisture & packaging — MSL level, vacuum bag, desiccant, humidity indicator (JEDEC J-STD-020 / J-STD-033)
  7. Shipment report — inspection photos and report number with every lot

What happens after you send an RFQ

  1. 1. We confirm your request and start the channel check
  2. 2. Quote with price, lead time, date code and Incoterm
  3. 3. Pay by T/T, PayPal, L/C or escrow
  4. 4. Inspection photos sent before shipping
  5. 5. 30-day quality guarantee and return policy

How to buy: payment terms, Incoterms and 30-day guarantee →