TI & ADI only, global channels

ULN2003BPWR

Texas Instruments · 16-TSSOP (PW)

ULN2003BPWR is a Texas Instruments part in the Low-side switches category (16-TSSOP (PW)). 50-V, 7-ch darlington array with 3-V input capability and low cost

Log in to view stock, price and recent changesActive

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Category
Low-side switches
Package
16-TSSOP (PW)
Manufacturer L/T
39 weeks
MOQ
1
SPQ
2000
HS code
854239
Checked

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source ULN2003BPWR?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

What is the lead time for ULN2003BPWR?

The manufacturer site lists a lead time of 39 weeks for ULN2003BPWR; confirm the current lead time with a quote.

How can I check ULN2003BPWR before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for ULN2003BPWR?

Manufacturer MOQ: 1 pc; SPQ: 2,000 pcs. Smaller sample quantities on request.

Same series · ULN2003B

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Packing & moisture

  • Standard pack quantity (SPQ): 2,000, packing: LARGE T&R
  • MSL: reference unavailable

Visual & marking

Package & dimensions

  • Alert Manufacturer lifecycle: obsolete, last time buy or not recommended for new designs. Send an inquiry; lead time and source are confirmed in the quotation.

Request G1 basic verification →

About ULN2003BPWR

ULN2003BPWR is an orderable part number (P/N) from Texas Instruments, in the ULN2003B family. Package: 16-TSSOP (PW). Category: Low-side switches. Other P/N in the ULN2003B family: 2. Lifecycle status on the manufacturer site: Active. Released September 11, 2014.

Get a quote for ULN2003BPWR

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.