TI & ADI only, global channels

UCC3580D-2

Texas Instruments · 16-SOIC (D)

UCC3580D-2 is a Texas Instruments part in the AC/DC controllers category (16-SOIC (D)). 16V active clamp current mode PWM controller with P-channel clamp FET and 10V turn-on, 0°C to 70°C

Log in to view stock, price and recent changesActive

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Category
AC/DC controllers
Package
16-SOIC (D)
Manufacturer L/T
39 weeks
MOQ
1
SPQ
40
HS code
854239
Checked

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source UCC3580D-2?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

What is the lead time for UCC3580D-2?

The manufacturer site lists a lead time of 39 weeks for UCC3580D-2; confirm the current lead time with a quote.

How can I check UCC3580D-2 before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for UCC3580D-2?

Manufacturer MOQ: 1 pc; SPQ: 40 pcs. Smaller sample quantities on request.

Same series · UCC3580-2

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Packing & moisture

  • Standard pack quantity (SPQ): 40, packing: TUBE
  • MSL: reference unavailable

Visual & marking

Package & dimensions

  • Alert Manufacturer lifecycle: obsolete, last time buy or not recommended for new designs. Send an inquiry; lead time and source are confirmed in the quotation.

Request G1 basic verification →

About UCC3580D-2

UCC3580D-2 is an orderable part number (P/N) from Texas Instruments, in the UCC3580-2 family. Package: 16-SOIC (D). Category: AC/DC controllers. Other P/N in the UCC3580-2 family: 2. Lifecycle status on the manufacturer site: Active. Released January 1, 1996.

Get a quote for UCC3580D-2

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.