TI & ADI only, global channels

UC2902N

Texas Instruments · 8-PDIP (P)

UC2902N is a Texas Instruments part in the AC/DC controllers category (8-PDIP (P)). 20V load share controller, -40°C to 85°C

Log in to view stock, price and recent changesActive

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Category
AC/DC controllers
Package
8-PDIP (P)
Manufacturer L/T
26 weeks
MOQ
1
SPQ
50
RoHS
Yes
HS code
854239
Checked

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source UC2902N?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

What is the lead time for UC2902N?

The manufacturer site lists a lead time of 26 weeks for UC2902N; confirm the current lead time with a quote.

How can I check UC2902N before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for UC2902N?

Manufacturer MOQ: 1 pc; SPQ: 50 pcs. Smaller sample quantities on request.

Same series · UC2902

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Documents & labels

  • RoHS: Yes
  • REACH (TI declaration): no SVHC above 0.1% and no Annex XVII restricted substance above its allowed limit. TI's definitions

Packing & moisture

  • Standard pack quantity (SPQ): 50, packing: TUBE
  • MSL: reference unavailable

Visual & marking

Package & dimensions

Request G1 basic verification →

About UC2902N

UC2902N is an orderable part number (P/N) from Texas Instruments, in the UC2902 family. Package: 8-PDIP (P). Category: AC/DC controllers. Other P/N in the UC2902 family: 3. Lifecycle status on the manufacturer site: Active. Released January 1, 1996.

Get a quote for UC2902N

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.