TI & ADI only, global channels

PCA9515AD

Texas Instruments · 8-SOIC (D)

PCA9515AD is a Texas Instruments part in the I2C & I3C level shifters, buffers & hubs category (8-SOIC (D)). 2-bit bidirectional 2.3- to 3.6-V 400-kHz I2C/SMBus buffer

Log in to view stock, price and recent changesActive

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Category
I2C & I3C level shifters, buffers & hubs
Package
8-SOIC (D)
MOQ
1
SPQ
75
RoHS
Yes
HS code
854239
Checked

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source PCA9515AD?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

How can I check PCA9515AD before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for PCA9515AD?

Manufacturer MOQ: 1 pc; SPQ: 75 pcs. Smaller sample quantities on request.

Same series · PCA9515A

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Documents & labels

  • RoHS: Yes
  • REACH (TI declaration): no SVHC above 0.1% and no Annex XVII restricted substance above its allowed limit. TI's definitions

Packing & moisture

  • Standard pack quantity (SPQ): 75, packing: TUBE
  • MSL: reference unavailable

Visual & marking

  • Manufacturer marking: PD515A (inferred from the datasheet of the same series)
  • Lead finish: reference unavailable

Package & dimensions

Request G1 basic verification →

About PCA9515AD

PCA9515AD is an orderable part number (P/N) from Texas Instruments, in the PCA9515A family. Package: 8-SOIC (D). Category: I2C & I3C level shifters, buffers & hubs. Other P/N in the PCA9515A family: 10. Lifecycle status on the manufacturer site: Active. Released February 3, 2006.

Get a quote for PCA9515AD

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.