TI & ADI only, global channels

OPA602BP

Texas Instruments · 8-PDIP (P)

OPA602BP is a Texas Instruments part in the General-purpose op amps category (8-PDIP (P)). High-Speed Precision Difet® Operational Amplifier

Out of stock

Manufacturer-site status, not our inventory.

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Manufacturer-site stock
Out of stock
Category
General-purpose op amps
Package
8-PDIP (P)
Manufacturer L/T
39 weeks
MOQ
1
HS code
854233
Checked
Last change on manufacturer site

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source OPA602BP?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

What is the lead time for OPA602BP?

The manufacturer site lists a lead time of 39 weeks for OPA602BP; confirm the current lead time with a quote.

How can I check OPA602BP before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for OPA602BP?

Manufacturer MOQ: 1 pc. Smaller sample quantities on request.

Same series · OPA602

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Packing & moisture

  • Standard pack quantity (SPQ): reference unavailable, packing: TUBE
  • MSL: reference unavailable

Visual & marking

Package & dimensions

  • Alert Manufacturer lifecycle: obsolete, last time buy or not recommended for new designs. Send an inquiry; lead time and source are confirmed in the quotation.

Request G1 basic verification →

About OPA602BP

OPA602BP is an orderable part number (P/N) from Texas Instruments, in the OPA602 family. Package: 8-PDIP (P). Category: General-purpose op amps. Other P/N in the OPA602 family: 2.

Get a quote for OPA602BP

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.