TI & ADI only, global channels

MAX6364PUT26+

Analog Devices · 6-SOT_23-N/A

MAX6364PUT26+ is a Analog Devices part in the Supervisors & Resets category (6-SOT_23-N/A). SOT23, Low-Power Microprocessor Supervisory Circuits with Battery Backup

Out of stockLast time buy

Manufacturer-site status, not our inventory.

Get price & lead timeDatasheet (manufacturer)

Brand
Analog Devices
Manufacturer-site stock
Out of stock
Category
Supervisors & Resets
Package
6-SOT_23-N/A
MOQ
1
SPQ
1
RoHS
Yes
Checked
Last change on manufacturer site

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source MAX6364PUT26+?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

How can I check MAX6364PUT26+ before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for MAX6364PUT26+?

Manufacturer MOQ: 1 pc; SPQ: 1 pc. Smaller sample quantities on request.

Same series · MAX6364P

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Documents & labels

  • RoHS: Yes

Packing & moisture

  • Standard pack quantity (SPQ): 1, packing: Reel
  • MSL: reference unavailable

Package & dimensions

  • Alert Manufacturer lifecycle: obsolete, last time buy or not recommended for new designs. Send an inquiry; lead time and source are confirmed in the quotation. Source: ADI_LIFECYCLE; ADI_CF

Request G1 basic verification →

About MAX6364PUT26+

MAX6364PUT26+ is an orderable part number (P/N) from Analog Devices, in the MAX6364P family. Package: 6-SOT_23-N/A. Category: Supervisors & Resets. Other P/N in the MAX6364P family: 8. Lifecycle status on the manufacturer site: Last time buy.

Get a quote for MAX6364PUT26+

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.