TI & ADI only, global channels

LTC1929IG-PG#PBF

Analog Devices · 28-Lead SSOP

LTC1929IG-PG#PBF is a Analog Devices part in the Switching Regulators & Controllers category (28-Lead SSOP). 2-Phase, High Efficiency, Synchronous Step-Down Switching Regulators

Out of stockActive

Manufacturer-site status, not our inventory.

Get price & lead timeDatasheet (manufacturer)

Brand
Analog Devices
Manufacturer-site stock
Out of stock
Category
Switching Regulators & Controllers
Package
28-Lead SSOP
Manufacturer L/T
11 weeks
MOQ
47
SPQ
47
RoHS
Yes
HS code
854239
Checked
Last change on manufacturer site

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source LTC1929IG-PG#PBF?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

What is the lead time for LTC1929IG-PG#PBF?

The manufacturer site lists a lead time of 11 weeks for LTC1929IG-PG#PBF; confirm the current lead time with a quote.

How can I check LTC1929IG-PG#PBF before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for LTC1929IG-PG#PBF?

Manufacturer MOQ: 47 pcs; SPQ: 47 pcs. Smaller sample quantities on request.

Same series · LTC1929

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Documents & labels

  • RoHS: Yes

Packing & moisture

  • Standard pack quantity (SPQ): 47, packing: Tube
  • MSL: reference unavailable

Package & dimensions

Request G1 basic verification →

About LTC1929IG-PG#PBF

LTC1929IG-PG#PBF is an orderable part number (P/N) from Analog Devices, in the LTC1929 family. Package: 28-Lead SSOP. Category: Switching Regulators & Controllers. Other P/N in the LTC1929 family: 9. Lifecycle status on the manufacturer site: Active.

Get a quote for LTC1929IG-PG#PBF

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.