TI & ADI only, global channels

8404201CA

Texas Instruments · 14-CDIP (J)

8404201CA is a Texas Instruments part in the NOR gates category (14-CDIP (J)). Military 3-ch, 3-input, 2-V to 6-V 5.2 mA drive strength NOR gate

Log in to view stock, price and recent changesActive

Get price & lead timeDatasheet (manufacturer)

Brand
Texas Instruments
Category
NOR gates
Package
14-CDIP (J)
MOQ
1
SPQ
25
RoHS
No
HS code
854239
Checked

Stock, price and recent changes

Log in to view stock, price and recent changes

Buyer questions

Can ChipRadar source 8404201CA?

Manufacturer-site stock is a dated snapshot, not our inventory. Send the quantity and required date; ChipRadar checks sourcing options and replies with price, lead time and D/C.

How can I check 8404201CA before I pay?

Ask for photos of the reel or tray labels and the D/C range with your quote. The scope of checks is agreed for each order.

What is the MOQ and packaging for 8404201CA?

Manufacturer MOQ: 1 pc; SPQ: 25 pcs. Smaller sample quantities on request.

Same series · SN54HC27

Incoming check

Marking, package, packing and compliance values are manufacturer-published data.

Documents & labels

  • RoHS: No
  • REACH (TI declaration): contains a REACH SVHC above 0.1%. SVHCs are not restricted from use, but further information must be available. TI's definitions

Packing & moisture

  • Standard pack quantity (SPQ): 25, packing: TUBE
  • MSL: reference unavailable

Visual & marking

Package & dimensions

  • Alert Contains lead or uses a RoHS exemption: the manufacturer RoHS status is "No". Please confirm that your production line and end market accept it. Source: SZZQ088T; SZZQ119

Request G1 basic verification →

About 8404201CA

8404201CA is an orderable part number (P/N) from Texas Instruments, in the SN54HC27 family. Package: 14-CDIP (J). Category: NOR gates. Other P/N in the SN54HC27 family: 8. Lifecycle status on the manufacturer site: Active. Released August 2, 1999.

Get a quote for 8404201CA

No account needed. Send the P/N and quantity; we check sourcing before quoting.

Add details (optional): required date, target price, date code and contact details
Quotes follow a channel check. Supply is arranged in the order of confirmed orders and payments received.