Operated by ONE BOM LIMITED (Hong Kong) · sourcing and inspection team in ShenzhenAllocation by confirmed order and payment priorityEvery lot inspected before shippingEscrow / PayPal / T/T / L/C

Audio clocks — in-stock parts

As of September 18, 2026, TI-ADI (ONE BOM LIMITED) lists 7 Audio clocks parts. Stock and lead time are confirmed with every quote.

Part numberPackageStockManufacturer
PLL1706DBQR
8.192 to 36.864-MHz, serially controlled, 3.3-V dual PLL multi-clock generator
20-SSOP (DBQ)In stockTexas InstrumentsQuote
PLL1705DBQR
3.3 V Dual PLL Multi-Clock Generator
20-SSOP (DBQ)In stockTexas InstrumentsQuote
PLL1706DBQ
8.192 to 36.864-MHz, serially controlled, 3.3-V dual PLL multi-clock generator
20-SSOP (DBQ)In stockTexas InstrumentsQuote
LMC567CMX/NOPB
Low Power Tone Decoder
8-SOIC (D)In stockTexas InstrumentsQuote
PLL1705DBQ
3.3 V Dual PLL Multi-Clock Generator
20-SSOP (DBQ)In stockTexas InstrumentsQuote
PLL1705DBQRG4
3.3 V Dual PLL Multi-Clock Generator
20-SSOP (DBQ)On requestTexas InstrumentsQuote
PLL1706DBQG4
8.192 to 36.864-MHz, serially controlled, 3.3-V dual PLL multi-clock generator
20-SSOP (DBQ)On requestTexas InstrumentsQuote

Manufacturers in this category

Quality process, mapped to industry standards

  1. Source verification — supplier credentials, lot origin declaration, authorized-chain records (AS6081)
  2. Incoming visual inspection — markings, coplanarity, oxidation, refurbishment signs (IDEA-STD-1010-B)
  3. X-ray — die, bond wires and voids compared with a golden sample (AS6171/4)
  4. Decap / solvent test — sample decapsulation for die marking; acetone marking test (IDEA-STD-1010-B)
  5. Functional / electrical test — key parameters on bench or at a third-party lab (AS6171/6)
  6. Moisture & packaging — MSL level, vacuum bag, desiccant, humidity indicator (JEDEC J-STD-020 / J-STD-033)
  7. Shipment report — inspection photos and report number with every lot

What happens after you send an RFQ

  1. 1. We confirm your request and start the channel check
  2. 2. Quote with price, lead time, date code and Incoterm
  3. 3. Pay by T/T, PayPal, L/C or escrow
  4. 4. Inspection photos sent before shipping
  5. 5. 30-day quality guarantee and return policy

How to buy: payment terms, Incoterms and 30-day guarantee →